{"id":18164,"date":"2023-05-22T13:17:39","date_gmt":"2023-05-22T11:17:39","guid":{"rendered":"https:\/\/khr.dk\/?p=18164"},"modified":"2023-05-24T10:32:04","modified_gmt":"2023-05-24T08:32:04","slug":"building-site-inspection-in-berlin","status":"publish","type":"post","link":"https:\/\/khr.dk\/en\/byggepladsbesigtigelse-i-berlin\/","title":{"rendered":"Building site inspection in Berlin"},"content":{"rendered":"<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18172\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-768x1024.jpg\" alt=\"Schule am Breiten Luch - construction site sign\" class=\"wp-image-18172\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggepladsskilt.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">The Am Breiten Luch school is being built on a challenging site in a heavily trafficked area. One of the architectural solutions is to stack the two sports halls on top of each other and raise them above ground level to optimise space utilisation, keep central piping clear and shield the learning spaces from traffic noise. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18176\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-768x1024.jpg\" alt=\"\" class=\"wp-image-18176\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-byggeplads.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">Lichtenberg is located in the eastern part of Berlin and is characterised by traditional East German slab construction. When the new school is completed, it will also serve as a gathering place for the local community by providing good facilities for sports, music, creative endeavours or gatherings of all kinds. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18168\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-768x1024.jpg\" alt=\"ABL construction\" class=\"wp-image-18168\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/abl-byggeri.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">The foundation stone was laid in January and now the Am Breiten Luch school is starting to go up. All concrete is cast in situ rather than using panels as would typically be done in Denmark.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18177\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-768x1024.jpg\" alt=\"\" class=\"wp-image-18177\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/kraner.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/www.howoge.de\/schulbau\/howoge-baut-schule.html\" target=\"_blank\" rel=\"noreferrer noopener\">HOWOGE<\/a> is one of Berlin's municipal housing associations and, with approximately 73,500 rental apartments, is one of Germany's largest landlords. Due to its long experience as a developer and the synergies inherent in the development of residential areas and the construction of new schools and daycare centres, HOWOGE also acts as the developer for a number of Berlin's numerous school projects. Due to a rapidly growing need for more school places, a \"Schulbauoffensive\" has been launched and HOWOGE alone is currently building 11 new schools.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18174\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-768x1024.jpg\" alt=\"\" class=\"wp-image-18174\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/fundament-abl.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">With the base plate in place and a building on its way up to the first floor, you can start to feel the school's spatialities and proportions 1:1. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"18175\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-768x1024.jpg\" alt=\"\" class=\"wp-image-18175\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-768x1024.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-225x300.jpg 225w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-113x150.jpg 113w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-576x768.jpg 576w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe-9x12.jpg 9w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/janina-zerbe.jpg 1000w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-element-caption\">Janina Zerbe is happy to see what started as a competition entry being realised.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"18178\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-1024x768.jpg\" alt=\"\" class=\"wp-image-18178\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-1024x768.jpg 1024w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-300x225.jpg 300w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-150x113.jpg 150w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-768x576.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-1536x1152.jpg 1536w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads-16x12.jpg 16w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/lars-kragh-byggeplads.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"18167\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-1024x768.jpg\" alt=\"\" class=\"wp-image-18167\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-1024x768.jpg 1024w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-300x225.jpg 300w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-150x113.jpg 150w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-768x576.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-1536x1152.jpg 1536w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning-16x12.jpg 16w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/udgravning.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">A large municipal water pipe runs across the site and must be kept clear of construction, which was one of the challenges in the design phase. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"18170\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-1024x768.jpg\" alt=\"\" class=\"wp-image-18170\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-1024x768.jpg 1024w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-300x225.jpg 300w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-150x113.jpg 150w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-768x576.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-1536x1152.jpg 1536w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl-16x12.jpg 16w, https:\/\/khr.dk\/wp-content\/uploads\/2023\/05\/byggefelt-for-abl.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The cranes are in position for the 5-storey building.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"17320\" src=\"https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-1024x576.jpg\" alt=\"Schule Am Breiten Luch visualisation of the school&#039;s architecture\" class=\"wp-image-17320\" srcset=\"https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-1024x576.jpg 1024w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-300x169.jpg 300w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-150x84.jpg 150w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-768x432.jpg 768w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-1536x864.jpg 1536w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide-18x10.jpg 18w, https:\/\/khr.dk\/wp-content\/uploads\/2021\/07\/am-breiten-luch-skole-rendering-wide.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">This is what the Am Breiten Luch school will look like when it is completed in two years.<\/figcaption><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>Construction of the \"Am Breiten Luch\" school in the Lichtenberg neighbourhood of Berlin is in full swing. Janina Zerbe, Lars Kragh and Carsten Hyldebrandt have been on site with our client, HOWOGE, and our German partner, Renner Architekten. The school with its double sports hall is scheduled for completion in the summer of 2025 and will contribute to a neighbourhood boost in the Lichtenberg district.<\/p>","protected":false},"author":4,"featured_media":18171,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"none","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"both","_seopress_redirections_param":"","_seopress_redirections_type":301,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[92],"tags":[],"class_list":["post-18164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-khr-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/posts\/18164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/comments?post=18164"}],"version-history":[{"count":5,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/posts\/18164\/revisions"}],"predecessor-version":[{"id":18197,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/posts\/18164\/revisions\/18197"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/media\/18171"}],"wp:attachment":[{"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/media?parent=18164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/categories?post=18164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/khr.dk\/en\/wp-json\/wp\/v2\/tags?post=18164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}